• International
  • United Kingdom
  • Australia
  • USA
  • Ireland
  • France
  • Login
    • Products
      • Metal Ceilings
        • Bespoke Ceilings
        • Suspended Ceilings
        • Ceiling Baffles
        • Ceiling Rafts
        • Linear Ceilings
        • Open Cell Ceilings
        • Polynodal Ceilings
        • Mesh
      • Data Centres
        • SAS Nexus
      • Finishes
        • Mesh
        • A/Maze
        • WoodTones
      • Integrated Lights
        • Suspended Ceiling Lights
        • Baffle Ceiling Lights
        • Linear Ceiling Lights
      • Room Comfort
        • Radiant Heating
        • Chilled Ceiling Systems
      • Architectural Metalwork
        • Acoustic Wall Systems
        • Protective Casings & Panels
        • Service Integration
        • Solar Mangement
    • Projects
    • Downloads
      • Metal Ceilings Technical Drawings
        • Suspended Ceilings
        • Ceiling Baffles
        • Ceiling Rafts
        • Linear Ceilings
        • Open Cell Ceilings
        • Trims & Perimeters
        • Perforations
      • Brochures
        • Project Books
        • Info Hub
          • Acoustics
          • Environmental Product Declarations
          • Sustainability
          • Environmental Accreditation Statements
          • Insider
          • O&M | COSHH Data Sheets
          • Testing & Standards
          • Manufacturing
          • CPD
          • Services
        • Blog
        • Careers
        • Contact
        • Products
          • Metal Ceilings
          • Data Centres
          • Finishes
          • Integrated Lights
          • Room Comfort
          • Architectural Metalwork
          • Bespoke Ceilings
          • Suspended Ceilings
          • Ceiling Baffles
          • Ceiling Rafts
          • Linear Ceilings
          • Open Cell Ceilings
          • Polynodal Ceilings
          • Mesh
          • SAS Nexus
          • Mesh
          • A/Maze
          • WoodTones
          • Suspended Ceiling Lights
          • Baffle Ceiling Lights
          • Linear Ceiling Lights
          • Radiant Heating
          • Chilled Ceiling Systems
          • Acoustic Wall Systems
          • Protective Casings & Panels
          • Service Integration
          • Solar Mangement
        • Projects
        • Downloads
          • Metal Ceilings Technical Drawings
          • Brochures
          • Project Books
          • Suspended Ceilings
          • Ceiling Baffles
          • Ceiling Rafts
          • Linear Ceilings
          • Open Cell Ceilings
          • Trims & Perimeters
          • Perforations
            • Info Hub
              Acoustics

              Acoustics

              Environmental Product Declarations

              Environmental Product Declarations

              Sustainability

              Sustainability

              Accreditations

              Environmental Accreditation Statements

              Insider

              Insider

              O&M / COSHH DATA SHEET

              O&M | COSHH Data Sheets

              Testing & Standards

              Testing & Standards

              Manufacturing

              Manufacturing

              CPD

              CPD

              Services

              Services

            • Blog
            • Careers
            • Contact
            Login
            • International
            • United Kingdom
            • Australia
            • USA
            • Ireland
            • France
            • Home
            • Blog

            Blog

            Read our latest updates, industry insights and awards.

            Futures SAS600 Education Large (4)

            Project Highlights January - June 2025

            3rd June 2025

            We’d like to recognise a selection of completed projects from the first half of 2025. From historic renovations in Scotland to high-performance workplaces in Australia, the USA, and beyond, each project reflects unique design goals met with tailored ceiling solutions—from SAS600 rafts in Edinburgh’s Futures Institute to bespoke systems in airports, offices, and hospitality spaces around the world.

            Read more
            Filter Search
            • All (56)
            • Company News (19)
            • Industry Insights (8)
            • Product Updates (4)
            • Project Updates (13)
            56 blog posts available Reset results
            WELL Building

            As 2020 forces design re-think, WELL delivers

            11th November 2020

            The IWBI’s excellent WELL Building Standard now has worldwide recognition and many supporters, with well over 5,000 accredited projects across 68 countries to date. SAS was delighted to be involved in one of the first UK projects where the wellbeing of occupants was central to the design. 4 Cannon Street, London achieved the coveted WELL Gold Certification.

            21.jpg

            OPERATIONS IN SAFE HANDS

            28th October 2020

            Newly appointed SAS Operations Director Steve Daniels is an engineer at heart. Interested in how things work and problem solving, Steve has twenty five years of experience in UK manufacturing in a diverse range of industries.

            IMG 5601

            Bahrain’s new luxury shopping mall to receive quality SAS treatment

            19th October 2020

            The new complex will cover an area of approximately 200,000 square-meters and includes an entertainment area, aquarium and multiplex cinema. SAS International have been invited to work on this highly complex project, which will require numerous SAS ceiling systems to achieve the client’s desired result.

            Screenshot 2020 10 06 At 23.53.12

            BREXIT Preparations

            5th October 2020

            It is impossible to forecast the actual situation UK businesses will face in January 2021. We have planned for the worst case, whilst hoping for the best. Our priority is to ensure that we can service you, our customers, in the event that no agreement is reached with the EU, causing problems with the import and export of raw materials and finished products.

            med-com-330ch-019 ©Philip Vile.jpg

            Ventilation, cooling and Covid-19. A radiant solution?

            5th August 2020

            The impact of Covid-19 is set to change the way buildings are ventilated and cooled. The virus could result in a move away from conventional, recirculating air conditioning systems to more innovative solutions such as radiant chilled ceilings and displacement ventilation to help minimise its transmission in new buildings.

            SAS200 metal ceiling

            METAL CEILINGS: A FIRST-CHOICE SOLUTION

            13th July 2020

            SAS is a world leader in the design and manufacture of performance metal ceiling systems. We passionately believe that our ceiling solutions provide beautiful, durable and cost-effective solutions to contemporary interior demands and this article sets out our case.

            Hua Sml 150 Com (1)

            Look Up for a Solution to Noisy Spaces

            24th June 2020

            Acoustics is a complicated subject, but in an office environment, the most significant consideration is that hard surfaces reflect sound while softer surfaces absorb it.  Hence the ubiquity of office carpets and fabric-covered screening.

            The inclusion of such materials helps, although in our new, super-clean, wipe-down world they are likely to be a lot less popular.

            Cent Com 330C 002

            The Office Is Dead/ Long Live the Office

            20th May 2020

            As an element of nervousness understandably surrounds the return to the office, an immediate move toward enclosed and protected spaces is likely.

            SAS has designed desktop and standalone Personal Space Management partitions as prefabricated solutions that can be quickly and easily installed on any office desk, crucially enabling offices to adapt ahead of reopening.

            Reading Office 4

            SAS LAUNCHES PERSONAL SPACE MANAGEMENT SOLUTIONS

            7th May 2020

            Our in-house teams have been developing products that not only contribute to the global effort of social distancing but aid in building confidence in those that will soon return to premises such as their workplace, service provider or retail outlets.

            Coronavirus

            Coronavirus Precautions

            11th March 2020

            In response to the current COVID-19 situation, we have already taken a number of precautionary measures to ensure we can continue to support our customers and their businesses, as well as keeping our team safe.

            Hub-Lrg-Teegrid-com (1)-min.jpg

            The TMT Sector: Anything But Traditional Ceiling Systems

            9th March 2020

            Workplace design has been revolutionised. Since the Googles, Yahoos and Hubspots of this world concluded that attracting talent meant making their workspaces fun nothing has been quite the same – and that goes for ceiling design: in spades.

            BBI WELL Montage Banner

            SAS INVESTS IN WELL

            6th February 2020

            SAS International is delighted to announce that it is the first UK supporting partner for the Blue Building Institute (BBI).  The Netherlands-based organisation exists to spread understanding and adoption of the WELL Building Standard.

            Previous
            • 1
            • 2
            • 3
            • 4
            • 5
            Next
            Legal
            • Terms & Conditions of Website
            • Terms & Conditions of Sale
            • Terms & Conditions of Purchase
            • Cookie Policy
            • Privacy Policy
            Quick Links
            • Contact an Office
            • About Us
            • Careers
            • Modern Slavery Statement 2025
            • Gender Pay Gap Report 2024
            CONTACT

            Address:
            Office 286, Level 2, European Business Center
            Dubai Investment Park
            Dubai, PO Box 450575
            United Arab Emirates

            Phone: +971 (0) 4 8855 545

            © SAS International 2025

            Created at The Hideout